United State Agency of International Development (USAID) -MSI - I am working with Tatweer program(National Capacity Development
in Public Management)as Data Collection Field Assistant.
Job duties ;-
o conduct field data collection by administrating questionnaires in ministries and institutions.
o Enter data into computer.
o Conduct one-by-one interview with senior level (Director General and above) staff at ministries and executive offices
o Facilitate, guide, and record multiple focus group discussions of 6 to 10 ministry staff members
o Transcribe and translate focus group discussions and in-depth interviews into MS Word
This project period was from Nov. 2009 till Now
Mubarak International Group - I had worked as Site Civil Engineer in Qaiyara military base(Q-WEST) Project in Nineveh province
under supervision by ministry of defense and ministry of rebuilding and housing. My work for executing roads and platforms
inside the military base. Those roads and platforms were two kinds; concrete pavement and asphalt pavement, total length of
roads was 2,400 meters for asphalt road and 1,100 meters for concrete roads. And 15,800 square meters for concrete platforms.
Job duties;-
o Lay out of the road and platform by using specific land survey instruments according to the drawings.
o Directing and observing the heavy equipments such as bulldozer, grader, shuffle, dump trucks, and compactor, to excavating
and grading of the foundation then moving the soil outside the site.
o Supervision of roads walkways works including wooden forms, pouring of concrete, and installing curbstone units.This
project period was from Jan 2009 to Oct 2009
During this project also I had took part with small project in Kaddimia city north of Baghdad which it was 830 meters
asphalt road within three months. this project was under supervision of Mayoralty of Baghdad.
Toltest Inc. I had worked as Quality Control Specialist in Combat Operations Position (COP) military base Project in Anbar
province under supervision of U.S Air Force Center Excellency Environment (AFCEE). I was responsible of 10 latrines building
and two barracks each one has 24 x 36 meters with steel structure roof.
Job duties ;-
o Following up of (the technical specifications according to the building standards and American building code ACI, work
activities execution according to scope of work, and schedule time and project progress).
o Set daily and weekly reports by excel sheet format including pictures and sending it to the head office..
o Adjusting and sometimes creating drawings by AutoCAD program.
o Compacting test of sub-grade layer by using DCP device.
o Inspection of each activity in the site.
This project period was from Jun 2008¬ to Oct 2008

Innovative Technical Solutions, Inc (ITSI) . I had worked as Quality Control Engineer in Borders Forts Project at Iraqi-Syrian
border in Anbar province under supervision of U.S Air Force Center Excellency Environment (AFCEE). The project was construction
of border police station consisting of building (18 x 24 )square meters with four corner rounded tower like old castle, and
(jail building, sunshades, maintenance building, four steel guard towers with 5 m height).also there was other project some
of its buildings were under my responsibility at (Al-Qaim Port of Entry).
Job duties ;-
o Following up of (the technical specifications according to the building standards and American building code ACI, work
activities execution according to scope of work, and schedule time and project progress).
o Set daily and weekly reports by excel sheet format including pictures and sending it to the head office..
o Adjusting and sometimes creating drawings by AutoCAD program.
o Inspection of each activity in the site.
This project period was from Sept 2006 to Jul 2007
Cape Inc. I had worked as Quality Control Engineer where I had taken part of rebuilding and renovation of a military site
for new Iraqi Army (3RD Brigade of the 6th Iraqi Army Division)at North of Baghdad near Qasr Til Almilh ( QTM-Abu Graib ),
this project had done In cooperation with Consulting Engineering Bureau in Baghdad university. This project was under supervision
of U.S Air Force Center Excellency Environment (AFCEE).
Job duties ;-
o Following up of (the technical specifications according to the building standards and American building code ACI, work
activities execution according to scope of work, and schedule time and project progress).
o Set daily and weekly reports by excel sheet format including pictures and sending it to the head office..
o Adjusting and sometimes creating drawings by AutoCAD program.
o Inspection of each activity in the site.
This project period was from Oct 2005 to May 2006

Nama Group Co. I had worked as Site Civil Engineer for the following projects;-
1- Renovation of Electrical substations (132,000 Kv to 11,000 Kv)at Washash-Mansor city in Baghdad, this project had done
In cooperation with Washington International Group Inc. This project was under supervision of U.S.A Corps of Engineers (GRD-GRC).60
days.
2- Renovation of Electrical substations (132,000 Kv to 11,000 Kv)at Kanaan village south Diyala Province, this project
had done In cooperation with Washington International Group Inc. This project was under supervision of U.S.A Corps of Engineers
(GRD-GRC).30 days.
3- Renovation of Electrical substations (132,000 Kv to 11,000 Kv)at Baquba city in Diyala Province, this project had done
In cooperation with Washington International Group Inc. This project was under supervision of U.S.A Corps of Engineers (GRD-GRC).30
days.
4- Laying a High Tension Cable(11,000 Kv) along 2,225 m from Rahmania electrical substation to Karama hospital at Baghdad,
This project was under direct supervision of U.S.A Corps of Engineers (GRD-GRC).30 days.
Where my job duties were (Executing of scope items, Following up of work quality, Converting plans to true on the ground)
these projects were during period from Mar 2005 to Jul 2005
Also with cooperation of Dubai Co. I had taken part with concrete construction work of two building of the German village
at Sulaymania province, where these were vertical concrete structural buildings (10 stories), And installing two generator
(one mega) for the presidency guest houses at Dukan and Derbikhan north and south of Sulaymania Province, respectively. These
projects were under supervision of Kurdistan Regional Government(KRG)from Mar 2008 to Jun 2008

Consulting Engineering Bureau/University of Nahrain. I had worked as Quality Control Engineer in Borders Forts Project at
Iraqi-Iranian borders in Wasit province under supervision of PARSONS INC. The project was construction of border police station
consisting of building (18 x 24 )square meters with four corner rounded tower like old castle, and (jail building, sunshades,
maintenance building, four steel guard towers with (5 m height).
Job duties ;-
o Following up of (the technical specifications according to the building standards and American building code ACI, work
activities execution according to scope of work, and schedule time and project progress).
o Set daily and weekly reports by excel sheet format including pictures and sending it to the head office..
o Adjusting and sometimes creating drawings by AutoCAD program.
o Inspection of each activity in the site.
This project period was 90 days from Oct 2004 to Jan 2005

|